Combined Heat and Power Plant - Winnington Works, Northwich
Operated by E.ON UK CHP Ltd, the Winnington Combined Heat and Power (CHP) plant in Northwich, Cheshire, is the largest such scheme in the UK. The scheme supplies a total of 400MW of steam to two Brunner Mond soda ash works, at Winnington and Lostock. Its 130MWe output also supplies the needs of the two sites.

Located at the Brunner Mond Winnington site, the main CHP plant consists of two gas turbines, two heat recovery boilers, a steam turbine and stand-by boiler capacity. The CHP plant supplies steam & electricity into the Brunner Mond site systems. A proportion of the steam used is returned to the CHP plant as condensate.

The fuel for the Winnington plant is natural gas which is supplied through a new 11km underground pipeline from the National Gas Transmission System at Nether Tabley to the Winnington site.

The Lostock site is supplied with steam from the Winnington CHP plant via two 5km over ground steam mains. Upon delivery to Lostock, some of the steam is passed straight to the site processes. The remainder of the steam is passed through a steam turbine located on the site ? and in doing so generates more electricity before it is sent into the site processes. Again, a proportion of the steam used is returned to the CHP Plant as condensate via a pipeline.
File information
Photographer:David Kitching
All pictures from:David Kitching - anzeigen
Date added:Dec 10, 2005
Dimensions:850 x 583 pixels
Displayed:9292 times
URL:http://www.industriekultur-fotografie.de/modules.php?name=Gallery&..
Favorites:Add to Favorites

 
   
    

All logos and trademarks in this site are property of their respective owner.
For more Details, take a look in our Copyright

The comments are property of their posters, all the rest © - 2024 by IKF Industriekultur-Fotografie