|
Patterns of Industry - Dials
|
Part of the dial board for turbine pump No.8 at Kempton Great Engines.
As well as the two triple expansion engines built in 1926-29, the pump house includes two steam turbines installed in 1933. These are also preserved, but not worked.
Zähler der Dampfturbinenpumpe Nr.8 bei Kempton Great Engines. Museal behalten, nicht betrieben.
|
|